Selected Projects

All
Leyland Way Gas Pre-Heat Upgrade Contract

Leyland Way Gas Pre-Heat Upgrade Contract

Pre-Heat Upgrade

Pipeline protection Kingsbury

Pipeline protection Kingsbury

Time-sensitive replacement

Farningham PRS rebuild

Farningham PRS rebuild

Time-sensitive replacement

Reinforcing an Aberdeenshire high pressure pipeline

Reinforcing an Aberdeenshire high pressure pipeline

8 month project over 1.8km

HS2 / Esso Pipeline diversion

HS2 / Esso Pipeline diversion

Making way for HS2

Lowestoft Harbour Tunnel Crossing

Lowestoft Harbour Tunnel Crossing

Replacement of temporary pipe solution

New Open Cycle Gas Turbine

New Open Cycle Gas Turbine

New project for Spalding Energy Expansion Ltd (Intergen)

Key Street rebuild for Southern Gas Networks

Key Street rebuild for Southern Gas Networks

Removal of old and installation of new boiler house

Westfield TRS modifications

Westfield TRS modifications

for Scotia Gas Networks

Crockmore PRS

Crockmore PRS

Construction of a new HP to HP regulator:

Upgrade for Northern Gas Network

Upgrade for Northern Gas Network

Upgrade of Little Burdon Works

Pipeline diversion

Pipeline diversion

Aallow for new housing development for Redrow Homes

Two Permanent Pigging Stations

Two Permanent Pigging Stations

Design and build

Major works for Southern Gas Networks

Major works for Southern Gas Networks

Works at Warblington PRS for Southern Gas Networks

Composite pipe repair for Greystar

Composite pipe repair for Greystar

Darke Engineering Ltd were contracted to carry out epair using the WrapMaster system.

Regulator stream replacement

Regulator stream replacement

Replacement of four regulator streams

Cowpen Bewley

Cowpen Bewley

Installation of four heat exchangers, two boiler houses and a pressure reduction unit

Installation of temporary pigging facilities

Installation of temporary pigging facilities

Tie-ins carried out in 24 hrs

Section 16 works: Protection of oil pipeline

Section 16 works: Protection of oil pipeline

Tie-ins carried out in 24 hrs